Choose the service that fits your project stage. Every report is prepared by our QS team and delivered on time β guaranteed.
From initial budget planning to full site execution β the right BOQ for every need.
A clear side-by-side view so you can choose the right service for your project.
| Feature |
Service 01 Planning Estimate |
Service 02 Bank / Client Quotation |
Service 03 Site Tracking BOQ |
|---|---|---|---|
| Pricing | |||
| Minimum Charge (up to 2,000 sqft) | βΉ3,000 | βΉ5,000 | βΉ6,000 |
| Minimum Charge (up to 2,000 sqft) | βΉ3,000 | βΉ5,000 | βΉ6,000 |
| Above 2,000 sqft rate | βΉ1.5 / sqft | βΉ2.5 / sqft | βΉ3 / sqft |
| Above 2,000 sqft rate | βΉ1.5 / sqft | βΉ2.5 / sqft | βΉ3 / sqft |
| Delivery | |||
| Delivery Timeline | β‘ 1 Day | π 2 Days | π 3β7 Days |
| Delivery Timeline | β‘ 1 Day | π 2 Days | π 3β7 Days |
| Format | PDF + Excel | PDF + Excel | PDF + Excel |
| Format | PDF + Excel | PDF + Excel | PDF + Excel |
| What You Need to Provide | |||
| Floor Plan (CAD Drawing) | β | β | β |
| Floor Plan (CAD Drawing) | β | β | β |
| Structural Drawings | β | Basic / Oral | β |
| Structural Drawings | β | Basic / Oral | β |
| Working Specifications | β | β | β |
| Working Specifications | β | β | β |
| Reports Included | |||
| Report 1 β Budget Summary | β PDF | β PDF | β PDF |
| Report 1 β Budget Summary | β PDF | β PDF | β PDF |
| Report 2 β BOQ | β PDF+Excel | β PDF+Excel | β PDF+Excel |
| Report 2 β BOQ | β PDF+Excel | β PDF+Excel | β PDF+Excel |
| Report 3 β Rate per Sqft Analysis | β PDF | β PDF | β PDF |
| Report 3 β Rate per Sqft Analysis | β PDF | β PDF | β PDF |
| Report 4 β Measurement Sheet (LBD) | β | β PDF | β PDF |
| Report 4 β Measurement Sheet (LBD) | β | β PDF | β PDF |
| Report 5 β Rate Analysis | β | β | β PDF |
| Report 5 β Rate Analysis | β | β | β PDF |
| Report 6 β Overall Resource List | β | β PDF | β PDF |
| Report 6 β Overall Resource List | β | β PDF | β PDF |
| Report 7 β Gross, Net, Margin Price Comparison | β | β | β PDF |
| Report 7 β Gross, Net, Margin Price Comparison | β | β | β PDF |
| Report 8 β Stagewise Report | β | β | β PDF |
| Report 8 β Stagewise Report | β | β | β PDF |
| Report 9A β Cement Consumption | β | β | β PDF |
| Report 9A β Cement Consumption | β | β | β PDF |
| Report 9B β Steel Consumption | β | β | β PDF |
| Report 9B β Steel Consumption | β | β | β PDF |
| Labour Splitup | β | β | β Excel |
| Labour Splitup | β | β | β Excel |
| Material Splitup | β | β | β Excel |
| Material Splitup | β | β | β Excel |
| Total Files | 3 Files | 5 Files | 12 Files |
| Total Files | 3 Files | 5 Files | 12 Files |
| Best For | |||
| Planning / Budget stage | β | β | β |
| Planning / Budget stage | β | β | β |
| Bank loan submission | β | β | β |
| Bank loan submission | β | β | β |
| Contractor quote verification | β | β | β |
| Contractor quote verification | β | β | β |
| Active construction tracking | β | β | β |
| Active construction tracking | β | β | β |
| Material procurement planning | β | β | β |
| Material procurement planning | β | β | β |
Add these services to any package based on your project requirements.
Talk to our team. We'll recommend the right service for your project in 15 minutes.